Intent: Encourage forest management program. Implementation: Use minimum of 50% of wood materials and products certified in accordance with FSC (Forest Stewardship Council) Principles and Criteria for wood building components: framing flooring and sub-flooring wood doors etc. Based on Cost of FSC wood products compared to total wood material cost. Exclude MEP and elevator equipment […]
Posts Tagged ‘Materials and Resources’
Materials and Resources 6 – Rapidly Renewable Materials
Intent: Reduce use of “long cycle” and finite raw materials. Implementation: Use rapidly renewable materials and products for 2.5% of total value of all building materials and products used (based on cost) harvested within a 10-year cycle or shorter consider: bamboo flooring wool cotton insulation cork flooring linoleum flooring wheat board cabinets straw board agrifiber […]
Materials and Resources 5.2 – Regional Materials – 20% Extracted, Processed & Manufactured Regionally
20% Extracted, Processed & Manufacturer Regionally Intent: Increase demand for building materials and products that are extracted and manufactured within the region. This supports indigenous resources and reduced environmental impacts from transportation. Implementation: Use materials that have been extracted, harvested, recovered or manufactured within 500 miles of the site Minimum 20% (based on cost) of […]
Materials and Resources 5.1 – Regional Materials – 10% Extracted, Processed & Manufactured Regionally
10% Extracted, Processed & Manufacturer Regionally Intent: Increase demand for building materials and products that are extracted and manufactured within the region. This supports indigenous resources and reduced environmental impacts from transportation. Implementation: Use materials that have been extracted, harvested, recovered or manufactured within 500 miles of the site Minimum 10% (based on cost) of […]
Materials and Resources 4.2 – Recycled Content – 20% Total Construction Material from Recycled Items (post consumer + 1/2 pre-consumer)
Same as credit MR 4.1, except for percentage of total construction material from recycled items (10% in Materials and Resources 4.1) 20% of Total Construction Material from Recycled Items (post consumer + 1/2 pre-consumer) Intention: Reduce impact from extraction and processing of virgin materials Increase use of recycled content in building Implementation: There are two […]
Materials and Resources 4.1 – Recycled Content – 10% Total Construction Material from Recycled Items (post consumer + 1/2 pre-consumer)
Same as credit MR 4.2, except for percentage of total construction material from recycled items (20% in Materials and Resources 4.2) 10% of Total Construction Material from Recycled Items (post consumer + 1/2 pre-consumer) Intention: Reduce impact from extraction and processing of virgin materials Increase use of recycled content in building Implementation: There are two […]
Materials and Resources 3.2 – Material Reuse – 10% Reused Items
Same as credit MR 3.1 , except for percentage of total construction material is reused items (5% in Materials and Resources 3.1) 10% of Total Construction Material is from reused items Intention: Reduce waste Reduce processing of virgin resources and materials Implementation: Definition of Reuse: bring back to original capacity & reduce use of original […]
Materials and Resources 3.1 – Material Reuse – 5% Reused Items
Same as credit MR 3.2 , except for percentage of total construction material is reused items (10% in Materials and Resources 3.2) 5% of Total Construction Material is from reused items Intention: Reduce waste Reduce processing of virgin resources and materials Implementation: Definition of Reuse: bring back to original capacity & reduce use of original […]
Materials and Resources 2.2 – Construction Waste Management – Divert 75%
Same as credit MR 2.1, except for percentage diverted (50% in Materials and Resources 2.1) Divert 75% Intention: Divert construction and demolition debris from landfills and incinerators Redirect recyclables back to manufacturing process Redirect reusable materials to appropriate sites Implementation: Develop a construction waste management plan to at a minimum, identify materials to be diverted: […]
Materials and Resources 2.1 – Construction Waste Management – Divert 50%
Same as credit MR 2.2, except for percentage diverted (75% in Materials and Resources 2.2) Divert 50% Intention: Divert construction and demolition debris from landfills and incinerators Redirect recyclables back to manufacturing process Redirect reusable materials to appropriate sites Implementation: Develop a construction waste management plan to at a minimum, identify materials to be diverted: […]